# Elevator status for Mannheim Hbf station

> Working — no active outages at Mannheim Hbf station.
> 
> 30-day uptime 94.5% · 90-day 95.1% · 100 incidents in the last 365 days · avg time to fix 1d.

Canonical: <https://www.elevatoruptime.com/building/1d09d789-2928-4f56-912d-7e430b1372a5>
Location: Willy-Brandt-Platz 17, 68161 Mannheim GERMANY
Transit agency: DB
Equipment inventory: 11 elevators · 13 escalators

## Status right now

Last outage resolved 1d ago.

## Reliability

- **30-day uptime:** 94.5%
- **90-day uptime:** 95.1%
- **Average time to fix (90 days):** 1d
- **Incidents in last 365 days:** 100

## Recent history (last 90 days)

- 2026-07-14 → 2026-07-15 (1d) · Elevator zu Gleis 9/10 Abschnitt A
- 2026-07-07 → 2026-07-17 (9d 22h) · Escalator zu Gleis 2 (aufwärts)
- 2026-07-06 → 2026-07-07 (23h 38m) · Escalator zu Gleis 9 (aufwärts)
- 2026-07-03 → 2026-07-04 (23h 48m) · Elevator im Treppenhaus (PA 3)
- 2026-06-28 → 2026-07-09 (10d 23h) · Elevator zu Gleis 9/10 Abschnitt A
- 2026-06-28 → 2026-06-29 (1d) · Escalator von Gleis 8 (abwärts)
- 2026-06-27 → 2026-06-29 (2d 1h) · Elevator zu Gleis 7/8 Abschnitt A
- 2026-06-26 → 2026-06-27 (23h 37m) · Escalator von Gleis 3 (abwärts)
- 2026-06-26 → 2026-06-27 (23h 38m) · Escalator zu Gleis 2 (aufwärts)
- 2026-06-23 → 2026-06-24 (23h 55m) · Escalator von Gleis 12 (abwärts)
- 2026-06-23 → 2026-06-25 (2d) · Elevator zu Gleis 9/10 Abschnitt A
- 2026-06-19 → 2026-06-20 (13h 25m) · Elevator zu Gleis 9/10 Abschnitt A
- 2026-06-19 → 2026-06-20 (13h 26m) · Elevator zu Gleis 7/8 Abschnitt A
- 2026-06-16 → 2026-06-17 (1d) · Escalator zu Gleis 9 (aufwärts)
- 2026-06-13 → 2026-06-15 (2d) · Escalator von EG zu UG (Ost abwärts)
- 2026-06-12 → 2026-06-13 (1d) · Escalator vom UG zu EG (West aufwärts)
- 2026-06-09 → 2026-06-10 (23h 59m) · Elevator zu Gleis 4/5 Abschnitt A
- 2026-06-09 → 2026-06-10 (23h 59m) · Elevator zu Gleis 9/10 Abschnitt A
- 2026-06-03 → 2026-06-04 (1d) · Elevator zu Gleis 7/8 Abschnitt A
- 2026-05-31 → 2026-06-01 (1d) · Escalator von Gleis 8 (abwärts)

## Service contractor

Service provider not yet verified. If you maintain these elevators or know who does, submit a tip at <https://www.elevatoruptime.com/building/1d09d789-2928-4f56-912d-7e430b1372a5#contractor>

## Data sources

- **Transit agency API** — 100 records

## Common questions

### Is the Mannheim Hbf elevator working right now?

Yes — no active outages at Mannheim Hbf. The last outage was resolved 1d ago.

### How do I report a broken elevator at Mannheim Hbf?

Use the report form at https://www.elevatoruptime.com/report. It takes about 15 seconds and no account is required.

### What's the 30-day elevator uptime at Mannheim Hbf?

The 30-day elevator uptime at Mannheim Hbf is 94.5%. That's low — this building has had significant elevator downtime in the last 30 days.

## Report or correct

- **Report a broken elevator or escalator:** <https://www.elevatoruptime.com/report>
- **Building owner or manager? Claim this listing:** <https://www.elevatoruptime.com/building/1d09d789-2928-4f56-912d-7e430b1372a5#claim> — or email <mailto:info@elevatoruptime.com?subject=Claim%20building%3A%20Mannheim%20Hbf%20station%20(1d09d789-2928-4f56-912d-7e430b1372a5)>
- **Elevator service contractor? Correct attribution:** <https://www.elevatoruptime.com/building/1d09d789-2928-4f56-912d-7e430b1372a5#contractor> — or email <mailto:info@elevatoruptime.com?subject=Contractor%20tip%3A%20Mannheim%20Hbf%20station%20(1d09d789-2928-4f56-912d-7e430b1372a5)>

---
Site overview for agents: <https://www.elevatoruptime.com/llms.txt>