# Elevator status for South Station

> Working — no active outages at South Station.
> 
> 30-day uptime 95.3% · 90-day 75.5% · 21 incidents in the last 365 days · avg time to fix 10h 16m.

Canonical: <https://www.elevatoruptime.com/building/2bdc8736-6f39-4db4-b257-e370fbca7ace>
Location: John F. Fitzgerald Expressway, Leather District, Downtown Boston, Boston, MA 02205
Transit agency: MBTA
Equipment inventory: 5 elevators

## Status right now

Last outage resolved 5d ago.

## Reliability

- **30-day uptime:** 95.3%
- **90-day uptime:** 75.5%
- **Average time to fix (90 days):** 10h 16m
- **Incidents in last 365 days:** 21

## Recent history (last 90 days)

- 2026-05-23 → 2026-05-30 (6d 8h) · Elevator
- 2026-05-18 → 2026-05-18 (2h 11m) · Elevator
- 2026-05-17 → 2026-05-18 (6h 21m) · Elevator
- 2026-05-13 → 2026-05-14 (7h 6m) · Elevator
- 2026-05-10 → 2026-05-10 (59m) · Elevator
- 2026-05-04 → 2026-05-04 (14h 36m) · Elevator
- 2026-05-02 → 2026-05-03 (3h 43m) · Elevator
- 2026-04-30 → 2026-04-30 (1h 23m) · Elevator
- 2026-04-29 → 2026-04-29 (3h 17m) · Elevator
- 2026-04-28 → 2026-04-28 (2h 55m) · Elevator
- 2026-04-26 → 2026-04-27 (3h 28m) · Elevator
- 2026-04-26 → 2026-04-26 (1h 29m) · Elevator
- 2026-04-26 → 2026-04-26 (1h 26m) · Elevator
- 2026-04-26 → 2026-04-26 (2h 28m) · Elevator
- 2026-04-26 → 2026-04-26 (1h 56m) · Elevator
- 2026-04-26 → 2026-04-26 (1h 44m) · Elevator
- 2026-04-25 → 2026-04-25 (3h 43m) · Elevator
- 2026-04-25 → 2026-04-25 (1h 25m) · Elevator
- 2026-04-25 → 2026-04-25 (1h 5m) · Elevator
- 2026-04-24 → 2026-04-24 (1h 41m) · Elevator

## Service contractor

Service provider not yet verified. If you maintain these elevators or know who does, submit a tip at <https://www.elevatoruptime.com/building/2bdc8736-6f39-4db4-b257-e370fbca7ace#contractor>

## Data sources

- **Transit agency API** — 23 records

## Common questions

### Is the South Station elevator working right now?

Yes — no active outages at South Station. The last outage was resolved 5d ago.

### How do I report a broken elevator at South Station?

Use the report form at https://www.elevatoruptime.com/report. It takes about 15 seconds and no account is required.

### What's the 30-day elevator uptime at South Station?

The 30-day elevator uptime at South Station is 95.3%. That's decent — elevators have been operational most of the time, but there's room for improvement.

## Report or correct

- **Report a broken elevator or escalator:** <https://www.elevatoruptime.com/report>
- **Building owner or manager? Claim this listing:** <https://www.elevatoruptime.com/building/2bdc8736-6f39-4db4-b257-e370fbca7ace#claim> — or email <mailto:info@elevatoruptime.com?subject=Claim%20building%3A%20South%20Station%20(2bdc8736-6f39-4db4-b257-e370fbca7ace)>
- **Elevator service contractor? Correct attribution:** <https://www.elevatoruptime.com/building/2bdc8736-6f39-4db4-b257-e370fbca7ace#contractor> — or email <mailto:info@elevatoruptime.com?subject=Contractor%20tip%3A%20South%20Station%20(2bdc8736-6f39-4db4-b257-e370fbca7ace)>

---
Machine-readable feed of all buildings with outages: <https://www.elevatoruptime.com/llms.txt/outages.json>
Site overview for agents: <https://www.elevatoruptime.com/llms.txt>
