# Elevator status for Bonn Hbf station

> Working — no active outages at Bonn Hbf station.
> 
> 30-day uptime 98.0% · 90-day 97.9% · 72 incidents in the last 365 days · avg time to fix 9h 6m.

Canonical: <https://www.elevatoruptime.com/building/3180cd67-9cb0-411b-8418-b3e22b6c006f>
Location: Im Hauptbahnhof 1, 53111 Bonn GERMANY
Transit agency: DB
Equipment inventory: 5 elevators · 10 escalators

## Status right now

Last outage resolved 3d ago.

## Reliability

- **30-day uptime:** 98.0%
- **90-day uptime:** 97.9%
- **Average time to fix (90 days):** 9h 6m
- **Incidents in last 365 days:** 72

## Recent history (last 90 days)

- 2026-07-14 → 2026-07-15 (1d) · Escalator Fahrtreppe Gleis 5, abwärts
- 2026-07-11 → 2026-07-12 (1d) · Escalator zu Gleis 1
- 2026-07-07 → 2026-07-09 (2d) · Escalator zu Gleis 1
- 2026-06-30 → 2026-07-01 (1d) · Escalator zu Gleis 1
- 2026-06-29 → 2026-06-30 (23h 26m) · Escalator Fahrtreppe Gleis 5, abwärts
- 2026-06-28 → 2026-06-29 (1d) · Escalator Fahrtreppe Gleis 5, aufwärts
- 2026-06-28 → 2026-06-29 (1d) · Escalator zu Gleis 1
- 2026-06-26 → 2026-06-27 (23h 38m) · Elevator zu Gleis 1
- 2026-06-15 → 2026-06-16 (23h 59m) · Escalator Fahrtreppe Gleis 5, abwärts
- 2026-06-12 → 2026-06-13 (1d) · Escalator zu Gleis 2/3
- 2026-06-11 → 2026-06-12 (23h 59m) · Escalator Fahrtreppe Bstg.3, aufwärts
- 2026-06-06 → 2026-06-08 (2d) · Elevator zu Gleis 5
- 2026-05-26 → 2026-05-27 (1d) · Escalator zu Gleis 1
- 2026-05-24 → 2026-05-25 (1d) · Escalator Fahrtreppe Bstg.3, aufwärts
- 2026-05-23 → 2026-05-24 (1d) · Escalator zu Gleis 1
- 2026-05-21 → 2026-05-22 (6h 10m) · Escalator Fahrtreppe Nord, Bstg.3, abwär
- 2026-05-21 → 2026-05-22 (6h 10m) · Escalator Fahrtreppe Bstg.3, aufwärts
- 2026-05-21 → 2026-05-22 (3h 10m) · Escalator zu Gleis 2/3
- 2026-05-21 → 2026-05-21 (3h 9m) · Escalator zu Gleis 1
- 2026-05-21 → 2026-05-21 (3h 9m) · Escalator zu Gleis 1

## Service contractor

Service provider not yet verified. If you maintain these elevators or know who does, submit a tip at <https://www.elevatoruptime.com/building/3180cd67-9cb0-411b-8418-b3e22b6c006f#contractor>

## Data sources

- **Transit agency API** — 72 records

## Common questions

### Is the Bonn Hbf elevator working right now?

Yes — no active outages at Bonn Hbf. The last outage was resolved 3d ago.

### How do I report a broken elevator at Bonn Hbf?

Use the report form at https://www.elevatoruptime.com/report. It takes about 15 seconds and no account is required.

### What's the 30-day elevator uptime at Bonn Hbf?

The 30-day elevator uptime at Bonn Hbf is 98.0%. That's decent — elevators have been operational most of the time, but there's room for improvement.

## Report or correct

- **Report a broken elevator or escalator:** <https://www.elevatoruptime.com/report>
- **Building owner or manager? Claim this listing:** <https://www.elevatoruptime.com/building/3180cd67-9cb0-411b-8418-b3e22b6c006f#claim> — or email <mailto:info@elevatoruptime.com?subject=Claim%20building%3A%20Bonn%20Hbf%20station%20(3180cd67-9cb0-411b-8418-b3e22b6c006f)>
- **Elevator service contractor? Correct attribution:** <https://www.elevatoruptime.com/building/3180cd67-9cb0-411b-8418-b3e22b6c006f#contractor> — or email <mailto:info@elevatoruptime.com?subject=Contractor%20tip%3A%20Bonn%20Hbf%20station%20(3180cd67-9cb0-411b-8418-b3e22b6c006f)>

---
Site overview for agents: <https://www.elevatoruptime.com/llms.txt>