# Elevator status for Mainz Hbf station

> Not working — 2 of 6 elevators out at Mainz Hbf station.
> 
> 30-day uptime 94.0% · 90-day 93.5% · 119 incidents in the last 365 days · avg time to fix 2d 5h.

Canonical: <https://www.elevatoruptime.com/building/34fc76d4-26ae-43d2-bfcc-c9c2938e9006>
Location: Bahnhofplatz, Neustadt, Mainz, Rheinland-Pfalz, 55116 DEUTSCHLAND
Transit agency: DB
Equipment inventory: 6 elevators · 11 escalators

## Status right now

Out since 4d ago.

## Reliability

- **30-day uptime:** 94.0%
- **90-day uptime:** 93.5%
- **Average time to fix (90 days):** 2d 5h
- **Incidents in last 365 days:** 119

## Active outages

- **Elevator zu Gleis 6/8 Abschnitt C/D** — earliest started 4d ago · Confirmed · source: Transit agency API
- **Elevator zu Gleis 1 (Abschnitt D-E)** — earliest started 4d ago · Confirmed · source: Transit agency API

## Recent history (last 90 days)

- 2026-09-02 → 2026-09-03 (1d) · Escalator Gleis 4/5 aufwärts
- 2026-09-02 → ongoing · Elevator zu Gleis 6/8 Abschnitt C/D
- 2026-09-02 → ongoing · Elevator zu Gleis 1 (Abschnitt D-E)
- 2026-09-02 → 2026-09-03 (1d) · Escalator Gleis 2/3 abwärts
- 2026-09-01 → 2026-09-03 (1d 23h) · Escalator Gleis 4/5 abwärts
- 2026-09-01 → 2026-09-03 (1d 23h) · Escalator Gleis 2/3 aufwärts
- 2026-08-31 → 2026-09-04 (3d 22h) · Escalator Gleis 6/8 aufwärts
- 2026-08-29 → 2026-08-30 (23h 8m) · Escalator Gleis 2/3 aufwärts
- 2026-08-26 → 2026-08-27 (1d 9h) · Elevator zu Gleis 6/8 Abschnitt C/D
- 2026-08-21 → 2026-08-24 (3d 11h) · Escalator Gleis 2/3 aufwärts
- 2026-08-19 → 2026-08-20 (1d) · Escalator Gleis 2/3 aufwärts
- 2026-08-15 → 2026-08-19 (4d) · Elevator zu Gleis 6/8 Abschnitt C/D
- 2026-08-09 → 2026-08-10 (1d) · Escalator oben 1.OG/GÜ: abwärts
- 2026-07-23 → 2026-07-24 (23h 53m) · Escalator unten EG/1.OG: abwärts
- 2026-07-17 → 2026-07-18 (23h 41m) · Escalator Gleis 4/5 abwärts
- 2026-07-17 → 2026-07-18 (23h 41m) · Escalator Gleis 4/5 aufwärts
- 2026-07-15 → 2026-07-16 (1d) · Escalator Gleis 4/5 abwärts
- 2026-07-15 → 2026-07-16 (1d) · Escalator Gleis 4/5 aufwärts
- 2026-07-14 → 2026-07-15 (1d) · Escalator Gleis 6/8 aufwärts
- 2026-07-14 → 2026-07-15 (1d) · Escalator Gleis 2/3 aufwärts

## Service contractor

Service provider not yet verified. If you maintain these elevators or know who does, submit a tip at <https://www.elevatoruptime.com/building/34fc76d4-26ae-43d2-bfcc-c9c2938e9006#contractor>

## Data sources

- **Transit agency API** — 119 records

## Common questions

### Is the Mainz Hbf elevator working right now?

No — 2 of 6 elevators out at Mainz Hbf. The earliest active outage started 4d ago.

### How do I report a broken elevator at Mainz Hbf?

Use the report form at https://www.elevatoruptime.com/report. It takes about 15 seconds and no account is required.

### What's the 30-day elevator uptime at Mainz Hbf?

The 30-day elevator uptime at Mainz Hbf is 94.0%. That's low — this building has had significant elevator downtime in the last 30 days.

## Report or correct

- **Report a broken elevator or escalator:** <https://www.elevatoruptime.com/report>
- **Building owner or manager? Claim this listing:** <https://www.elevatoruptime.com/building/34fc76d4-26ae-43d2-bfcc-c9c2938e9006#claim> — or email <mailto:info@elevatoruptime.com?subject=Claim%20building%3A%20Mainz%20Hbf%20station%20(34fc76d4-26ae-43d2-bfcc-c9c2938e9006)>
- **Elevator service contractor? Correct attribution:** <https://www.elevatoruptime.com/building/34fc76d4-26ae-43d2-bfcc-c9c2938e9006#contractor> — or email <mailto:info@elevatoruptime.com?subject=Contractor%20tip%3A%20Mainz%20Hbf%20station%20(34fc76d4-26ae-43d2-bfcc-c9c2938e9006)>

---
Site overview for agents: <https://www.elevatoruptime.com/llms.txt>