# Elevator status for Frankfurt (Main) Hauptwache station

> Working — no active outages at Frankfurt (Main) Hauptwache station.
> 
> 30-day uptime 94.9% · 90-day 93.8% · 78 outages in the last 365 days · avg time to fix 2d 7h.

Canonical: <https://www.elevatoruptime.com/building/3bb628e2-d727-4bec-aac8-8536e305bbc8>
Location: Biebergasse 6-10, 60313 Frankfurt am MAIN
Transit agency: DB
Equipment inventory: 1 elevator · 8 escalators

## Status right now

Last outage resolved 2d ago.

## Reliability

- **30-day uptime:** 94.9%
- **90-day uptime:** 93.8%
- **Average time to fix (90 days):** 2d 7h
- **Outages in last 365 days:** 78

## Recent history (last 90 days)

- 2026-10-13 → 2026-10-15 (1d 21h) · Escalator zu Gleis 2/3 (S-Bahn)
- 2026-10-02 → 2026-10-04 (1d 23h) · Escalator zu Gleis 2/3 (S-Bahn)
- 2026-09-28 → 2026-09-29 (1d) · Escalator zu Gleis 2/3 (S-Bahn)
- 2026-09-25 → 2026-09-26 (23h 49m) · Elevator zu Gleis 2/3 (S-Bahn)
- 2026-09-22 → 2026-09-23 (1d) · Escalator zu Gleis 2/3 (S-Bahn)
- 2026-09-20 → 2026-09-24 (3d 19h) · Elevator zu Gleis 2/3 (S-Bahn)
- 2026-09-16 → 2026-09-20 (4d 4h) · Escalator B-Ebene <-> Bahnsteig
- 2026-09-15 → 2026-09-16 (23h 55m) · Escalator zu Gleis 2/3 (S-Bahn)
- 2026-09-10 → 2026-09-11 (23h 59m) · Escalator B-Ebene <-> Bahnsteig
- 2026-09-02 → 2026-09-03 (1d) · Escalator zu Gleis 2/3 (S-Bahn)
- 2026-08-26 → 2026-08-27 (1d 9h) · Escalator Aufwärts von Gleis 2/3 S-Bahn
- 2026-08-20 → 2026-08-21 (1d) · Escalator zu Gleis 2/3 (S-Bahn)
- 2026-08-18 → 2026-08-19 (1d) · Escalator zu Gleis 2/3 (S-Bahn)
- 2026-08-13 → 2026-09-01 (19d 3h) · Elevator zu Gleis 2/3 (S-Bahn)
- 2026-08-09 → 2026-08-12 (3d) · Elevator zu Gleis 2/3 (S-Bahn)
- 2026-08-07 → 2026-08-08 (12h 43m) · Escalator zu Gleis 2/3 (S-Bahn)
- 2026-07-31 → 2026-08-01 (23h 49m) · Escalator Aufwärts von Gleis 2/3 S-Bahn
- 2026-07-31 → 2026-08-01 (23h 49m) · Escalator B-Ebene <-> Bahnsteig
- 2026-07-29 → 2026-07-30 (10h 43m) · Escalator zu Gleis 2/3 (S-Bahn)
- 2026-07-27 → 2026-07-28 (23h 20m) · Escalator Aufwärts von Gleis 2/3 S-Bahn

## Service contractor

Service provider not yet verified. If you maintain these elevators or know who does, submit a tip at <https://www.elevatoruptime.com/building/3bb628e2-d727-4bec-aac8-8536e305bbc8#contractor>

## Data sources

- **Transit agency API** — 78 records

## Common questions

### Is the Frankfurt (Main) Hauptwache elevator working right now?

Yes — no active outages at Frankfurt (Main) Hauptwache. The last outage was resolved 2d ago.

### How do I report a broken elevator at Frankfurt (Main) Hauptwache?

Use the report form at https://www.elevatoruptime.com/report. It takes about 15 seconds and no account is required.

### What's the 30-day elevator uptime at Frankfurt (Main) Hauptwache?

The 30-day elevator uptime at Frankfurt (Main) Hauptwache is 94.9%. That's low — this building has had significant elevator downtime in the last 30 days.

## Report or correct

- **Report a broken elevator or escalator:** <https://www.elevatoruptime.com/report>
- **Building owner or manager? Claim this listing:** <https://www.elevatoruptime.com/building/3bb628e2-d727-4bec-aac8-8536e305bbc8#claim> — or email <mailto:info@elevatoruptime.com?subject=Claim%20building%3A%20Frankfurt%20(Main)%20Hauptwache%20station%20(3bb628e2-d727-4bec-aac8-8536e305bbc8)>
- **Elevator service contractor? Correct attribution:** <https://www.elevatoruptime.com/building/3bb628e2-d727-4bec-aac8-8536e305bbc8#contractor> — or email <mailto:info@elevatoruptime.com?subject=Contractor%20tip%3A%20Frankfurt%20(Main)%20Hauptwache%20station%20(3bb628e2-d727-4bec-aac8-8536e305bbc8)>

---
Site overview for agents: <https://www.elevatoruptime.com/llms.txt>
