# Elevator status for Duisburg Hbf station

> Not working — 1 of 6 elevators out and 1 of 6 escalators out at Duisburg Hbf station.
> 
> 30-day uptime 69.9% · 90-day 76.6% · 71 outages in the last 365 days · avg time to fix 3d 3h.

Canonical: <https://www.elevatoruptime.com/building/52049051-0eb7-4cf0-aa1a-3a07e2b6a2c2>
Location: Portsmouthpl. 1, 47051 DUISBURG
Transit agency: DB
Equipment inventory: 6 elevators · 6 escalators

## Status right now

Out since 6mo ago.

## Reliability

- **30-day uptime:** 69.9%
- **90-day uptime:** 76.6%
- **Average time to fix (90 days):** 3d 3h
- **Outages in last 365 days:** 71

## Active outages

- **Escalator Bstg.2 Gleis 3-4 Verknüpfung** — earliest started 6mo ago · Confirmed · source: Transit agency API
- **Elevator zu Gleis 3/4 Abschnitt B/C** — earliest started 6mo ago · Confirmed · source: Transit agency API

## Recent history (last 90 days)

- 2026-11-02 → 2026-11-03 (23h 59m) · Escalator zu Gleis 10/11
- 2026-11-02 → 2026-11-04 (1d 23h) · Escalator FAHRTREPPEN BSTG.6 GLEIS 12-13
- 2026-10-29 → 2026-10-30 (23h 58m) · Escalator Bstg.3 Gleis 5-6 Verknüpfung
- 2026-10-17 → 2026-10-18 (1d) · Escalator Bstg.6 Gleis 12-13 Verknüpfun
- 2026-10-16 → 2026-10-17 (23h 46m) · Elevator zu Gleis 12/13 Abschnitt B/C
- 2026-10-10 → 2026-10-31 (20d 17h) · Escalator zu Gleis 10/11
- 2026-10-10 → 2026-11-01 (21d 17h) · Elevator zu Gleis 10/11 Abschnitt B/C
- 2026-10-02 → 2026-10-03 (23h 32m) · Escalator Bstg.3 Gleis 5-6 Verknüpfung
- 2026-09-28 → 2026-10-01 (3d) · Escalator FAHRTREPPEN BSTG.6 GLEIS 12-13
- 2026-09-22 → 2026-09-23 (1d) · Elevator zu Gleis 12/13 Abschnitt B/C
- 2026-09-08 → 2026-09-09 (1d) · Escalator FAHRTREPPEN BSTG.6 GLEIS 12-13
- 2026-09-03 → 2026-09-04 (1d) · Elevator zu Gleis 10/11 Abschnitt B/C
- 2026-09-03 → 2026-09-04 (1d) · Elevator zu Gleis 12/13 Abschnitt B/C
- 2026-09-03 → 2026-09-04 (1d) · Elevator zu Gleis 5/6 Abschnitt B/C
- 2026-09-03 → 2026-09-05 (1d 23h) · Elevator zu Gleis 1/2 Abschnitt B/C
- 2026-09-03 → 2026-09-04 (1d) · Elevator zu Gleis 8/9 Abschnitt B/C
- 2026-08-29 → 2026-08-31 (1d 23h) · Escalator zu Gleis 10/11
- 2026-08-25 → 2026-08-26 (1d) · Escalator Bstg.3 Gleis 5-6 Verknüpfung
- 2026-08-20 → 2026-08-21 (1d) · Escalator zu Gleis 10/11
- 2026-08-19 → 2026-08-21 (2d) · Elevator zu Gleis 12/13 Abschnitt B/C

## Service contractor

Service provider not yet verified. If you maintain these elevators or know who does, submit a tip at <https://www.elevatoruptime.com/building/52049051-0eb7-4cf0-aa1a-3a07e2b6a2c2#contractor>

## Data sources

- **Transit agency API** — 71 records

## Common questions

### Is the Duisburg Hbf elevator working right now?

No — 1 of 6 elevators out and 1 of 6 escalators out at Duisburg Hbf. The earliest active outage started 6mo ago.

### How do I report a broken elevator at Duisburg Hbf?

Use the report form at https://www.elevatoruptime.com/report. It takes about 15 seconds and no account is required.

### What's the 30-day elevator uptime at Duisburg Hbf?

The 30-day elevator uptime at Duisburg Hbf is 69.9%. That's low — this building has had significant elevator downtime in the last 30 days.

## Report or correct

- **Report a broken elevator or escalator:** <https://www.elevatoruptime.com/report>
- **Building owner or manager? Claim this listing:** <https://www.elevatoruptime.com/building/52049051-0eb7-4cf0-aa1a-3a07e2b6a2c2#claim> — or email <mailto:info@elevatoruptime.com?subject=Claim%20building%3A%20Duisburg%20Hbf%20station%20(52049051-0eb7-4cf0-aa1a-3a07e2b6a2c2)>
- **Elevator service contractor? Claim your devices:** <https://www.elevatoruptime.com/building/52049051-0eb7-4cf0-aa1a-3a07e2b6a2c2#claim-devices> — or send a tip by email <mailto:info@elevatoruptime.com?subject=Contractor%20tip%3A%20Duisburg%20Hbf%20station%20(52049051-0eb7-4cf0-aa1a-3a07e2b6a2c2)>

---
Site overview for agents: <https://www.elevatoruptime.com/llms.txt>
