# Elevator status for Leipzig Hbf station

> Working — no active outages at Leipzig Hbf station.
> 
> 30-day uptime 98.2% · 90-day 98.0% · 35 incidents in the last 365 days · avg time to fix 3h 42m.

Canonical: <https://www.elevatoruptime.com/building/5edfe92d-f362-42f1-861e-e866462d9af3>
Location: Bahnhofshalle;Reisezentrum, 7 Willy-Brandt-Platz, Zentrum-Ost, Mitte, Leipzig, Sachsen, 04109 DEUTSCHLAND
Transit agency: DB
Equipment inventory: 3 elevators · 6 escalators

## Status right now

Last outage resolved 20h ago.

## Reliability

- **30-day uptime:** 98.2%
- **90-day uptime:** 98.0%
- **Average time to fix (90 days):** 3h 42m
- **Incidents in last 365 days:** 35

## Recent history (last 90 days)

- 2026-05-22 → 2026-05-22 (19m) · Elevator von UG zu Gleis 1/2
- 2026-05-21 → 2026-05-21 (3h 20m) · Elevator von EG zu UG
- 2026-05-21 → 2026-05-21 (19m) · Elevator von UG zu Gleis 1/2
- 2026-05-19 → 2026-05-19 (1h 20m) · Escalator zu Gleis 1/2
- 2026-05-18 → 2026-05-19 (8h 39m) · Escalator zu Gleis 1/2
- 2026-05-18 → 2026-05-18 (30m) · Escalator von EG zu OG
- 2026-05-16 → 2026-05-16 (2h 50m) · Escalator
- 2026-05-16 → 2026-05-16 (3h 19m) · Elevator von EG zu UG
- 2026-05-13 → 2026-05-13 (50m) · Escalator von EG zu OG
- 2026-05-12 → 2026-05-12 (1h 30m) · Escalator zu Gleis 1/2
- 2026-05-12 → 2026-05-12 (7h) · Escalator von EG zu OG
- 2026-05-11 → 2026-05-11 (5h 59m) · Escalator von EG zu OG
- 2026-05-11 → 2026-05-11 (5h 59m) · Escalator
- 2026-05-10 → 2026-05-11 (5h 30m) · Escalator von EG zu OG
- 2026-05-10 → 2026-05-10 (50m) · Escalator zu Gleis 1/2
- 2026-05-09 → 2026-05-10 (8h 50m) · Escalator zu Gleis 1/2
- 2026-05-08 → 2026-05-09 (8h 20m) · Escalator zu Gleis 1/2
- 2026-05-07 → 2026-05-08 (7h 49m) · Escalator zu Gleis 1/2
- 2026-05-07 → 2026-05-07 (2h 51m) · Escalator
- 2026-05-05 → 2026-05-05 (2h 20m) · Escalator zu Gleis 1/2

## Service contractor

Service provider not yet verified. If you maintain these elevators or know who does, submit a tip at <https://www.elevatoruptime.com/building/5edfe92d-f362-42f1-861e-e866462d9af3#contractor>

## Data sources

- **Transit agency API** — 35 records

## Common questions

### Is the Leipzig Hbf elevator working right now?

Yes — no active outages at Leipzig Hbf. The last outage was resolved 20h ago.

### How do I report a broken elevator at Leipzig Hbf?

Use the report form at https://www.elevatoruptime.com/report. It takes about 15 seconds and no account is required.

### What's the 30-day elevator uptime at Leipzig Hbf?

The 30-day elevator uptime at Leipzig Hbf is 98.2%. That's decent — elevators have been operational most of the time, but there's room for improvement.

## Report or correct

- **Report a broken elevator or escalator:** <https://www.elevatoruptime.com/report>
- **Building owner or manager? Claim this listing:** <https://www.elevatoruptime.com/building/5edfe92d-f362-42f1-861e-e866462d9af3#claim> — or email <mailto:info@elevatoruptime.com?subject=Claim%20building%3A%20Leipzig%20Hbf%20station%20(5edfe92d-f362-42f1-861e-e866462d9af3)>
- **Elevator service contractor? Correct attribution:** <https://www.elevatoruptime.com/building/5edfe92d-f362-42f1-861e-e866462d9af3#contractor> — or email <mailto:info@elevatoruptime.com?subject=Contractor%20tip%3A%20Leipzig%20Hbf%20station%20(5edfe92d-f362-42f1-861e-e866462d9af3)>

---
Machine-readable feed of all buildings with outages: <https://www.elevatoruptime.com/llms.txt/outages.json>
Site overview for agents: <https://www.elevatoruptime.com/llms.txt>
