# Elevator status for Stuttgart Flughafen/Messe station

> Working — no active outages at Stuttgart Flughafen/Messe station.
> 
> 30-day uptime 99.2% · 90-day 99.2% · 11 incidents in the last 365 days · avg time to fix 1h 50m.

Canonical: <https://www.elevatoruptime.com/building/8a904858-24d5-4cfc-a9a8-513eb392649b>
Location: P5, Flughafenstraße, Echterdingen, Stuttgart, Leinfelden-Echterdingen, Landkreis Esslingen, Baden-Württemberg, 70629 DEUTSCHLAND
Transit agency: DB
Equipment inventory: 4 escalators

## Status right now

Last outage resolved 1d ago.

## Reliability

- **30-day uptime:** 99.2%
- **90-day uptime:** 99.2%
- **Average time to fix (90 days):** 1h 50m
- **Incidents in last 365 days:** 11

## Recent history (last 90 days)

- 2026-05-21 → 2026-05-21 (1h 9m) · Escalator v.Terminal z.Gleis 1/2(S-Bahn)
- 2026-05-21 → 2026-05-21 (1h 9m) · Escalator v.Gleis 1/2 (S-Bahn)z.Terminal
- 2026-05-21 → 2026-05-21 (1h 30m) · Escalator v.Terminal z.Gleis 1/2(S-Bahn)
- 2026-05-18 → 2026-05-18 (3h 20m) · Escalator v. Gleis 1/2 (S-Bahn) z. Pass.
- 2026-05-18 → 2026-05-18 (3h 20m) · Escalator v. Pass. z. Gleis 1/2 (S-Bahn)
- 2026-05-09 → 2026-05-09 (3h 20m) · Escalator v. Gleis 1/2 (S-Bahn) z. Pass.
- 2026-05-03 → 2026-05-03 (2h 29m) · Escalator v. Pass. z. Gleis 1/2 (S-Bahn)
- 2026-05-03 → 2026-05-03 (50m) · Escalator v.Gleis 1/2 (S-Bahn)z.Terminal
- 2026-05-02 → 2026-05-02 (39m) · Escalator v. Pass. z. Gleis 1/2 (S-Bahn)
- 2026-04-27 → 2026-04-27 (50m) · Escalator v. Gleis 1/2 (S-Bahn) z. Pass.
- 2026-04-26 → 2026-04-26 (1h 40m) · Escalator v. Gleis 1/2 (S-Bahn) z. Pass.

## Service contractor

Service provider not yet verified. If you maintain these elevators or know who does, submit a tip at <https://www.elevatoruptime.com/building/8a904858-24d5-4cfc-a9a8-513eb392649b#contractor>

## Data sources

- **Transit agency API** — 11 records

## Common questions

### Is the Stuttgart Flughafen/Messe elevator working right now?

Yes — no active outages at Stuttgart Flughafen/Messe. The last outage was resolved 1d ago.

### How do I report a broken elevator at Stuttgart Flughafen/Messe?

Use the report form at https://www.elevatoruptime.com/report. It takes about 15 seconds and no account is required.

### What's the 30-day elevator uptime at Stuttgart Flughafen/Messe?

The 30-day elevator uptime at Stuttgart Flughafen/Messe is 99.2%. That's excellent — elevators have been operational almost all of the time.

## Report or correct

- **Report a broken elevator or escalator:** <https://www.elevatoruptime.com/report>
- **Building owner or manager? Claim this listing:** <https://www.elevatoruptime.com/building/8a904858-24d5-4cfc-a9a8-513eb392649b#claim> — or email <mailto:info@elevatoruptime.com?subject=Claim%20building%3A%20Stuttgart%20Flughafen%2FMesse%20station%20(8a904858-24d5-4cfc-a9a8-513eb392649b)>
- **Elevator service contractor? Correct attribution:** <https://www.elevatoruptime.com/building/8a904858-24d5-4cfc-a9a8-513eb392649b#contractor> — or email <mailto:info@elevatoruptime.com?subject=Contractor%20tip%3A%20Stuttgart%20Flughafen%2FMesse%20station%20(8a904858-24d5-4cfc-a9a8-513eb392649b)>

---
Machine-readable feed of all buildings with outages: <https://www.elevatoruptime.com/llms.txt/outages.json>
Site overview for agents: <https://www.elevatoruptime.com/llms.txt>
