# Elevator status for Bergfelde (b Berlin) station

> Working — no active outages at Bergfelde (b Berlin) station.
> 
> 30-day uptime 99.3% · 90-day 99.3% · 1 incident in the last 365 days.

Canonical: <https://www.elevatoruptime.com/building/97b43038-9354-4a33-b545-80c11bb093b7>
Location: Brückenstraße, Bergfelde, Hohen Neuendorf, Oberhavel, Brandenburg, 16562 DEUTSCHLAND
Transit agency: DB
Equipment inventory: 1 elevator

## Status right now

Last outage resolved 10d ago.

## Reliability

- **30-day uptime:** 99.3%
- **90-day uptime:** 99.3%
- **Incidents in last 365 days:** 1

## Recent history (last 90 days)

- 2026-05-12 → 2026-05-12 (1h 50m) · Elevator zu Gleis 1/2 (S-Bahn)

## Service contractor

Service provider not yet verified. If you maintain these elevators or know who does, submit a tip at <https://www.elevatoruptime.com/building/97b43038-9354-4a33-b545-80c11bb093b7#contractor>

## Data sources

- **Transit agency API** — 1 record

## Common questions

### Is the Bergfelde (b Berlin) elevator working right now?

Yes — no active outages at Bergfelde (b Berlin). The last outage was resolved 10d ago.

### How do I report a broken elevator at Bergfelde (b Berlin)?

Use the report form at https://www.elevatoruptime.com/report. It takes about 15 seconds and no account is required.

### What's the 30-day elevator uptime at Bergfelde (b Berlin)?

The 30-day elevator uptime at Bergfelde (b Berlin) is 99.3%. That's excellent — elevators have been operational almost all of the time.

## Report or correct

- **Report a broken elevator or escalator:** <https://www.elevatoruptime.com/report>
- **Building owner or manager? Claim this listing:** <https://www.elevatoruptime.com/building/97b43038-9354-4a33-b545-80c11bb093b7#claim> — or email <mailto:info@elevatoruptime.com?subject=Claim%20building%3A%20Bergfelde%20(b%20Berlin)%20station%20(97b43038-9354-4a33-b545-80c11bb093b7)>
- **Elevator service contractor? Correct attribution:** <https://www.elevatoruptime.com/building/97b43038-9354-4a33-b545-80c11bb093b7#contractor> — or email <mailto:info@elevatoruptime.com?subject=Contractor%20tip%3A%20Bergfelde%20(b%20Berlin)%20station%20(97b43038-9354-4a33-b545-80c11bb093b7)>

---
Machine-readable feed of all buildings with outages: <https://www.elevatoruptime.com/llms.txt/outages.json>
Site overview for agents: <https://www.elevatoruptime.com/llms.txt>
