# Elevator status for Gelsenkirchen Hbf station

> Working — no active outages at Gelsenkirchen Hbf station.
> 
> 30-day uptime 99.3% · 90-day 98.7% · 28 incidents in the last 365 days · avg time to fix 8h 26m.

Canonical: <https://www.elevatoruptime.com/building/d57d9c86-814c-4f53-aa22-9a2c55139356>
Location: 10 Bahnhofsvorplatz, Altstadt, Gelsenkirchen-Mitte, Gelsenkirchen, Nordrhein-Westfalen, 45879 DEUTSCHLAND
Transit agency: DB
Equipment inventory: 3 elevators · 6 escalators

## Status right now

Last outage resolved 19d ago.

## Reliability

- **30-day uptime:** 99.3%
- **90-day uptime:** 98.7%
- **Average time to fix (90 days):** 8h 26m
- **Incidents in last 365 days:** 28

## Recent history (last 90 days)

- 2026-06-28 → 2026-06-30 (1d 23h) · Elevator zu Gleis 4/5
- 2026-06-10 → 2026-06-11 (1d) · Elevator zu Gleis 4/5
- 2026-06-04 → 2026-06-05 (23h 59m) · Escalator zu Gleis 6/7
- 2026-05-29 → 2026-05-30 (23h 59m) · Escalator zu Gleis 4/5
- 2026-05-26 → 2026-05-27 (23h 59m) · Escalator zu Gleis 4/5
- 2026-05-21 → 2026-05-22 (12h 50m) · Escalator zu Gleis 4/5
- 2026-05-19 → 2026-05-19 (4h 30m) · Escalator zu Gleis 4/5
- 2026-05-17 → 2026-05-17 (3h 40m) · Elevator zu Gleis 4/5
- 2026-05-17 → 2026-05-18 (10h 19m) · Elevator zu Gleis 6/7
- 2026-05-17 → 2026-05-17 (3h 40m) · Elevator zu Gleis 8/25
- 2026-05-16 → 2026-05-16 (1h 30m) · Escalator von EG zu Zwischenebene
- 2026-05-14 → 2026-05-15 (14h 40m) · Elevator zu Gleis 8/25
- 2026-05-14 → 2026-05-14 (29m) · Escalator zu Gleis 6/7
- 2026-05-14 → 2026-05-14 (20m) · Escalator zu Gleis 4/5
- 2026-05-14 → 2026-05-14 (49m) · Escalator von EG zu Zwischenebene
- 2026-05-14 → 2026-05-14 (40m) · Escalator zur Verteilerebene
- 2026-05-14 → 2026-05-14 (2h 59m) · Escalator zu Gleis 6/7
- 2026-05-13 → 2026-05-13 (30m) · Escalator von Gleis 4/5
- 2026-05-08 → 2026-05-08 (1h 39m) · Escalator zu Gleis 4/5
- 2026-05-06 → 2026-05-06 (2h) · Escalator von Gleis 6/7

## Service contractor

Service provider not yet verified. If you maintain these elevators or know who does, submit a tip at <https://www.elevatoruptime.com/building/d57d9c86-814c-4f53-aa22-9a2c55139356#contractor>

## Data sources

- **Transit agency API** — 28 records

## Common questions

### Is the Gelsenkirchen Hbf elevator working right now?

Yes — no active outages at Gelsenkirchen Hbf. The last outage was resolved 19d ago.

### How do I report a broken elevator at Gelsenkirchen Hbf?

Use the report form at https://www.elevatoruptime.com/report. It takes about 15 seconds and no account is required.

### What's the 30-day elevator uptime at Gelsenkirchen Hbf?

The 30-day elevator uptime at Gelsenkirchen Hbf is 99.3%. That's excellent — elevators have been operational almost all of the time.

## Report or correct

- **Report a broken elevator or escalator:** <https://www.elevatoruptime.com/report>
- **Building owner or manager? Claim this listing:** <https://www.elevatoruptime.com/building/d57d9c86-814c-4f53-aa22-9a2c55139356#claim> — or email <mailto:info@elevatoruptime.com?subject=Claim%20building%3A%20Gelsenkirchen%20Hbf%20station%20(d57d9c86-814c-4f53-aa22-9a2c55139356)>
- **Elevator service contractor? Correct attribution:** <https://www.elevatoruptime.com/building/d57d9c86-814c-4f53-aa22-9a2c55139356#contractor> — or email <mailto:info@elevatoruptime.com?subject=Contractor%20tip%3A%20Gelsenkirchen%20Hbf%20station%20(d57d9c86-814c-4f53-aa22-9a2c55139356)>

---
Site overview for agents: <https://www.elevatoruptime.com/llms.txt>
