# Elevator status for Heidelberg Hbf station

> Working — no active outages at Heidelberg Hbf station.
> 
> 30-day uptime 94.9% · 90-day 97.4% · 34 incidents in the last 365 days · avg time to fix 10h 39m.

Canonical: <https://www.elevatoruptime.com/building/e6b138ef-9c93-4eaa-875a-966d9ed820a8>
Location: Max-Planck-Ring, Bahnstadt, Heidelberg, Baden-Württemberg, 69115 DEUTSCHLAND
Transit agency: DB
Equipment inventory: 3 elevators · 4 escalators

## Status right now

Last outage resolved 12d ago.

## Reliability

- **30-day uptime:** 94.9%
- **90-day uptime:** 97.4%
- **Average time to fix (90 days):** 10h 39m
- **Incidents in last 365 days:** 34

## Recent history (last 90 days)

- 2026-06-25 → 2026-07-01 (6d) · Elevator zu Gleis 4/5 und Überführung
- 2026-06-23 → 2026-06-24 (23h 55m) · Elevator zu Gleis 9/10 und Überführung
- 2026-06-18 → 2026-06-22 (3d 15h) · Elevator zu Gleis 4/5 und Überführung
- 2026-05-30 → 2026-05-31 (1d) · Escalator von Gleis 8 aufwärts
- 2026-05-25 → 2026-05-27 (2d) · Elevator zu Gleis 4/5 und Überführung
- 2026-05-22 → 2026-05-22 (1h 39m) · Escalator zu Gleis 4 abwärts
- 2026-05-19 → 2026-05-19 (19m) · Escalator von Gleis 8 aufwärts
- 2026-05-19 → 2026-05-19 (19m) · Escalator von Gleis 5 aufwärts
- 2026-05-18 → 2026-05-18 (19m) · Escalator von Gleis 5 aufwärts
- 2026-05-17 → 2026-05-17 (3h 20m) · Escalator zu Gleis 4 abwärts
- 2026-05-15 → 2026-05-15 (29m) · Escalator von Gleis 5 aufwärts
- 2026-05-12 → 2026-05-12 (39m) · Elevator zu Gleis 9/10 und Überführung
- 2026-05-12 → 2026-05-12 (50m) · Escalator von Gleis 8 aufwärts
- 2026-05-12 → 2026-05-12 (20m) · Escalator von Gleis 5 aufwärts
- 2026-05-11 → 2026-05-11 (30m) · Elevator AUSGANG BAHNSTADT
- 2026-05-10 → 2026-05-10 (4h) · Escalator zu Gleis 7 abwärts
- 2026-05-08 → 2026-05-08 (20m) · Escalator von Gleis 8 aufwärts
- 2026-05-07 → 2026-05-07 (30m) · Escalator von Gleis 8 aufwärts
- 2026-05-06 → 2026-05-06 (20m) · Escalator von Gleis 8 aufwärts
- 2026-05-06 → 2026-05-06 (49m) · Escalator von Gleis 5 aufwärts

## Service contractor

Service provider not yet verified. If you maintain these elevators or know who does, submit a tip at <https://www.elevatoruptime.com/building/e6b138ef-9c93-4eaa-875a-966d9ed820a8#contractor>

## Data sources

- **Transit agency API** — 34 records

## Common questions

### Is the Heidelberg Hbf elevator working right now?

Yes — no active outages at Heidelberg Hbf. The last outage was resolved 12d ago.

### How do I report a broken elevator at Heidelberg Hbf?

Use the report form at https://www.elevatoruptime.com/report. It takes about 15 seconds and no account is required.

### What's the 30-day elevator uptime at Heidelberg Hbf?

The 30-day elevator uptime at Heidelberg Hbf is 94.9%. That's low — this building has had significant elevator downtime in the last 30 days.

## Report or correct

- **Report a broken elevator or escalator:** <https://www.elevatoruptime.com/report>
- **Building owner or manager? Claim this listing:** <https://www.elevatoruptime.com/building/e6b138ef-9c93-4eaa-875a-966d9ed820a8#claim> — or email <mailto:info@elevatoruptime.com?subject=Claim%20building%3A%20Heidelberg%20Hbf%20station%20(e6b138ef-9c93-4eaa-875a-966d9ed820a8)>
- **Elevator service contractor? Correct attribution:** <https://www.elevatoruptime.com/building/e6b138ef-9c93-4eaa-875a-966d9ed820a8#contractor> — or email <mailto:info@elevatoruptime.com?subject=Contractor%20tip%3A%20Heidelberg%20Hbf%20station%20(e6b138ef-9c93-4eaa-875a-966d9ed820a8)>

---
Site overview for agents: <https://www.elevatoruptime.com/llms.txt>
