# Elevator status for Neckargemünd Altstadt station

> Not working — 1 of 2 elevators out at Neckargemünd Altstadt station.
> 
> 30-day uptime 88.1% · 90-day 93.2% · 9 incidents in the last 365 days · avg time to fix 19h 59m.

Canonical: <https://www.elevatoruptime.com/building/f1ef40d0-0e1c-41c3-b21e-eeb505e4a8b3>
Location: K 4200, Kleingemünd, Neckargemünd, GVV Neckargemünd, Rhein-Neckar-Kreis, Baden-Württemberg, 69151 DEUTSCHLAND
Transit agency: DB
Equipment inventory: 2 elevators

## Status right now

Out since 2d ago.

## Reliability

- **30-day uptime:** 88.1%
- **90-day uptime:** 93.2%
- **Average time to fix (90 days):** 19h 59m
- **Incidents in last 365 days:** 9

## Active outages

- **Elevator zu Gleis 2 und Überführung** — earliest started 2d ago · Confirmed · source: Transit agency API

## Recent history (last 90 days)

- 2026-07-11 → ongoing · Elevator zu Gleis 2 und Überführung
- 2026-07-08 → 2026-07-10 (2d) · Elevator zu Gleis 1 und Überführung
- 2026-07-02 → 2026-07-03 (23h 49m) · Elevator zu Gleis 1 und Überführung
- 2026-07-01 → 2026-07-02 (23h 28m) · Elevator zu Gleis 2 und Überführung
- 2026-06-19 → 2026-06-20 (13h 27m) · Elevator zu Gleis 1 und Überführung
- 2026-05-26 → 2026-05-27 (1d) · Elevator zu Gleis 1 und Überführung
- 2026-05-26 → 2026-05-27 (1d) · Elevator zu Gleis 2 und Überführung
- 2026-05-07 → 2026-05-07 (50m) · Elevator zu Gleis 2 und Überführung
- 2026-05-06 → 2026-05-06 (1h 30m) · Elevator zu Gleis 2 und Überführung

## Service contractor

Service provider not yet verified. If you maintain these elevators or know who does, submit a tip at <https://www.elevatoruptime.com/building/f1ef40d0-0e1c-41c3-b21e-eeb505e4a8b3#contractor>

## Data sources

- **Transit agency API** — 9 records

## Common questions

### Is the Neckargemünd Altstadt elevator working right now?

No — 1 of 2 elevators out at Neckargemünd Altstadt. The earliest active outage started 2d ago.

### How do I report a broken elevator at Neckargemünd Altstadt?

Use the report form at https://www.elevatoruptime.com/report. It takes about 15 seconds and no account is required.

### What's the 30-day elevator uptime at Neckargemünd Altstadt?

The 30-day elevator uptime at Neckargemünd Altstadt is 88.1%. That's low — this building has had significant elevator downtime in the last 30 days.

## Report or correct

- **Report a broken elevator or escalator:** <https://www.elevatoruptime.com/report>
- **Building owner or manager? Claim this listing:** <https://www.elevatoruptime.com/building/f1ef40d0-0e1c-41c3-b21e-eeb505e4a8b3#claim> — or email <mailto:info@elevatoruptime.com?subject=Claim%20building%3A%20Neckargem%C3%BCnd%20Altstadt%20station%20(f1ef40d0-0e1c-41c3-b21e-eeb505e4a8b3)>
- **Elevator service contractor? Correct attribution:** <https://www.elevatoruptime.com/building/f1ef40d0-0e1c-41c3-b21e-eeb505e4a8b3#contractor> — or email <mailto:info@elevatoruptime.com?subject=Contractor%20tip%3A%20Neckargem%C3%BCnd%20Altstadt%20station%20(f1ef40d0-0e1c-41c3-b21e-eeb505e4a8b3)>

---
Site overview for agents: <https://www.elevatoruptime.com/llms.txt>
