Elevator Uptime

NYC SCHOOL CONSTRUCTION

203-02 109 Avenue, Queens

1 accessibility lift

Live status unavailable

We don’t have a real-time feed for this building. The only data on file comes from compliance inspection records, which can be weeks or months old and don’t indicate whether an elevator is working right now.

Open compliance records

Inspection records that haven’t been administratively closed. Each represents a permit or out-of-service finding, not a real-time signal that the equipment is unusable today.

Accessibility lift 4W1001949· Compliance record
Started Aug 6, 12:00 AM UTC· NYC DOB inspections
  • NYC DOB device_status=Work in Progress; evidence: https://data.cityofnewyork.us/dataset/DOB-NOW-Elevator-Safety-Compliance/e5aq-a4j2

Location

203-02 109 Avenue, Queens

History

Not yet available — inspection-only data source
Uptime and time-to-fix require a live feed. Compliance records only.

No resolved compliance records in the last 90 days — active outages above.

Common questions

Who maintains the accessibility lifts at NYC SCHOOL CONSTRUCTION?+

Recent elevator permits at NYC SCHOOL CONSTRUCTION have been filed by Elevation Elevator INC, according to NYC DOB Elevator Permit Applications. Service relationships can change — building owners and contractors can submit corrections.

Accountability

Service contractor

Elevation Elevator INC

Most recent elevator permits at this address were filed by this firm, according to NYC DOB (record Q01266519-I1). Observed Apr 17, 2026.view source

inferred from permitsService relationships change over time and may not reflect current contracts. Contractors and building owners can request corrections — see methodology.

Owner of record

No ownership record on file.

Verified claim

Not yet claimed by owner or manager.

Own or manage NYC SCHOOL CONSTRUCTION?Takes about 2 minutes

Claim the listing to post right-of-reply on outages, add contractor and contact info, and correct anything that’s wrong. No paywall.

Building activity

Nothing has been posted to this building yet. Post the first update.